How to Schedule Concrete Deliveries for Maximum Efficiency
When it comes to concrete, timing is everything. Whether you're pouring a small foundation or managing a large-scale commercial project, how you schedule your concrete deliveries can impact your budget, your labor, and the quality of the final result.
At Orgain Ready Mix, we know that efficient scheduling doesn't just keep things moving—it ensures the concrete arrives when and how you need it, without waste or delays. Here's how to plan your concrete deliveries for maximum efficiency.

1. Start with a Clear Timeline and Pour Plan
Before you pick up the phone or place an order, make sure your site is prepared and your team is aligned. Ask yourself:
- What time will the crew be ready to pour?
- How many cubic yards are needed?
- Will the pour happen all at once or in phases?
- Are there any access or site challenges?
Having these details up front allows us to schedule your delivery more precisely, helping you avoid idle labor or rushed pours.
2. Communicate With Your Ready-Mix Supplier Early
The earlier you get on the schedule, the better. During peak building seasons or in high-demand regions, time slots can fill up quickly. Booking your delivery 2–3 days in advance (or more for large pours) increases your chances of getting your preferred time.
At Orgain Ready Mix, we offer flexible delivery windows, but advance notice gives us more room to meet your specific needs.
3. Factor in Traffic, Site Access, and Setup Time
Think beyond just the delivery time—consider everything that happens before and after the truck arrives. For example:
- Will trucks need to stage off-site?
- Is the route clear for mixers to back in safely?
- Will there be a pump or chute involved?
Small delays in unloading can impact not just your job, but the next customer's delivery. Planning ahead keeps the day running smoothly.
4. Stagger Deliveries for Large Pours
If your job requires multiple trucks, don't schedule them all at once. Too many trucks on-site at the same time can cause bottlenecks, wasted material, and rushed pours. Staggering trucks 20–30 minutes apart gives your crew time to manage each load properly and keeps things moving without overwhelming the site.
We can help you create a delivery cadence that aligns with your crew size, pour rate, and project pace.
5. Stay Flexible (And Keep Us in the Loop)
Weather changes, equipment delays, and site conditions can all throw off your schedule. The key is communication. If you need to shift your delivery time, let us know as soon as possible. The more we know, the better we can adjust to keep your project on track.
At Orgain Ready Mix, we value being more than just a supplier—we’re a partner in making your job successful.
Let’s Pour With Confidence
Scheduling concrete deliveries doesn’t have to be a headache. With clear planning, strong communication, and the right partner on your side, your project can stay efficient from the first truck to the final finish.